
2025, 10 weeks on site
Legal basement suite
An unfinished basement turned into a registered two-bedroom suite with its own entrance, laundry and heating.
Most of our renovation work is in older Calgary homes: 1950s bungalows, 1970s splits and infills that need a second look. We open up walls, move kitchens, finish basements and bring tired houses up to current code.
You deal with one project lead the whole way through. They price the job, run the schedule, manage the trades and walk the finished house with you.
Book a site visit
A kitchen or bathroom usually takes 4 to 8 weeks on site. A whole-home renovation is typically 4 to 7 months, depending on scope and permit timing.

2025, 10 weeks on site
An unfinished basement turned into a registered two-bedroom suite with its own entrance, laundry and heating.

2024, 7 weeks on site
A new kitchen built around a bay window, flooring throughout, and a mudroom where an awkward side entry used to be.
We also do basement suites and backyard suites and custom homes.
Often, yes. For smaller projects we seal off the work area and keep a kitchen or bathroom running. For whole-home work we'll tell you honestly at the first visit whether moving out will save time and money.
Yes. We prepare drawings, apply for City of Calgary building and trade permits, and book all inspections.
Yes. We'll check your home against the current requirements for secondary suites, then design and build to meet them so the suite can be registered.
We'll come out, look at the house or lot, and give you an honest read on scope, timing and cost. No charge for the first visit.